Ukrgasvydobuvannya has drilled two high-rate wells. One of them is the appraisal well at the recently discovered field and the other is the development well at the 50-year-old field.
Drilling points have been defined based on historic 3D seismic data.
“We continue to work both with the green and the brown fields and we see that our approaches are efficient. These are not the first successful high-rate wells at these fields, yielding to the significant growth of the cumulative production of the company,” Oleg Tolmachev, the acting CEO at Ukrgasvydobuvannya said.
The second well is a development well drilled at the brownfield containing the deposits with high remaining potential but also characterised by the complex geologic structure. Results of this well drilling allowed increasing gas production at the fields by 156 tcm, specifying the geologic structure of the field, as well as identifying the plans for further drilling.
Both wells have been drilled by Ukrgasvydobuvannya’s Branch, Ukrburgaz DD.